Digital infrastructure · Paraguay · Ethiopia · Since 2018

Built. Energised. Renewable.

Paracan builds and operates Bitcoin-mining and data-centre infrastructure in Paraguay and Ethiopia — 53 MW built, 100% renewable power, no bank debt.

Built across two countries
53MW
Renewable electricity
100%
Miners sourced
20,000+
Bank debt
0

01 · The platform

Most mining plays are a plan still needing capital, or a fleet fully exposed to hashprice. Paracan is neither.

  1. 01

    Self-mining

    Our own fleet: 4,000 S19 XP · 456 PH/s · 9 MW.

    Earns Bitcoin

  2. 02

    Hosting

    Client fleets at our sites, 17 MW in Ethiopia today.

    Earns fees

  3. 03

    Development & O&M

    Turnkey builds for a repeat client: 12 MW, still run by Paracan.

    Earns fees

  4. 04

    Equipment procurement

    Sourcing, import, delivery: 20,000+ miners to date.

    Earns fees

3 of 4 lines earn fees, not Bitcoin.

02 · Footprint

One platform. Two operating jurisdictions.

Headquartered in Asunción, with three data centres in Paraguay and a 20 MW site in Ethiopia — and a blueprint to develop AI sites across Latin America.

  • ParaguayHeadquarters in Asunción · three data centres: Altos, MRA and CBO
  • Ethiopia20 MW site · built in ten months · operating since December 2024
  • Latin AmericaRegion of our AI-site blueprint
  • CanadaWhere it started, 2017

Next

A blueprint for AI sites in Latin America.

Paracan has developed a blueprint to develop AI data-centre sites across Latin America — built on what we already do: securing renewable power, building turnkey and operating on the ground.

  • Renewable power access
  • Turnkey build 53 MW built to date
  • On-the-ground operations

03 · Infrastructure

Built, not contracted.

All 41 MW is energised, operating infrastructure — not a permit, an allocation or a plan. 27 MW is under load today.

Paraguay · owned

Altos · MRA · CBO

HQ in Asunción · Itaipú power via ANDE

Three data centres, operating since 2020

Ethiopia

Built in ten months

Built and operated · our first site abroad

Operating since December 2024

53MW built

Every square is a megawatt

53 MW built: 21 MW owned in Paraguay, 20 MW in Ethiopia, and 12 MW built in Paraguay for a client and still operated by Paracan. 9 MW energised and available in Paraguay: no construction, land or new energy approval needed.
Paracan mining hall under a skylight
Itaipú Dam on the Paraná River

04 · Energy

Computing powered by water.

Our sites draw on hydro-led national grids: Itaipú via ANDE in Paraguay, and Ethiopian Electric Power in Ethiopia.

Renewable electricity
100%
Energy cost · Paraguay
US$47/MWh
Built on ANDE supply since 2020
33MW
All-in production cost per BTCSelf-mining fleet · June 2026 model
US$53,503

From river to rack

How the power reaches the hashboards.

  • 100% renewable
  • No fuel-price exposure
  • Off-peak by design
Energy flow: hydroelectric generation feeds the national grid (ANDE in Paraguay, EEP in Ethiopia), which supplies Paracan's data centres. HydroelectricItaipú · Ethiopian hydro National gridANDE since 2020 · EEP Paracan data centres41 MW built & operated Energy flow: hydroelectric generation feeds the national grid, which supplies Paracan's data centres. HydroelectricItaipú · Ethiopian hydro National gridANDE since 2020 · EEP Paracan data centres41 MW built & operated

The fleet steps back in peak-tariff windows, for about 80% run-time, and is cooled by evaporative walls and pads rather than energy-hungry chillers.

Renewable: generation mix of each site's national grid. Cost per BTC: energy plus site overhead at August 2026 difficulty; excludes depreciation, financing and tax. Unaudited model, not a forecast.

05 · Track record

Trusted to build and operate for others.

Hosting client · 2024–2026

Bitmain

25 months

Hosted at our Paraguayan sites, February 2024 – March 2026.

Repeat developer client · 2024–2025

Two turnkey builds

2 × 6 MW

PPA, land, design, construction and miners, delivered in 2024 and 2025. Both still operated by Paracan.

06 · History

Eight years of building.

From a single site to a regional operator: from running our own machines, to hosting institutional fleets, to building and operating facilities for others.

  1. 2017

    Prologue in Canada

    The founders begin building data centres in Canada, then turn to Paraguay's renewable power.

  2. 2018

    Group founded

    Paracan Group is founded.

  3. End2019

    Site 1 complete

    Construction of the first data centre is completed.

  4. Mar2020

    First operations

    Site 1 begins operating, and has run continuously ever since.

  5. 2020

    Energy supply with ANDE

    Energy supply agreement signed with ANDE, Paraguay's national utility.

  6. 2021

    Site 2 online

    Second site brought online. Iván Kronawetter joins to lead mining operations.

  7. Miners and exhaust fans inside a Paracan hall
  8. 2021–22

    Top-10 Litecoin

    Ranked among the world's top ten Litecoin miners.

  9. 2023

    Institutional hosting

    Hosting-partner agreement signed with Bitmain; family-office capacity hosted.

  10. Paracan data centre under construction, 2023
  11. Feb2024

    Two fronts at once

    Bitmain hosting begins in Paraguay, and ground is broken on 20 MW in Ethiopia.

  12. 2024

    First turnkey build

    A 6 MW facility delivered turnkey for a client, with ongoing operations.

  13. Dec2024

    Ethiopia operating

    20 MW delivered in ten months.

  14. Transformers beside a Paracan data centre, Paraguay
  15. 2025

    Repeat client

    Second 6 MW facility for the same client: 12 MW under Paracan management.

  16. 2026

    Own fleet

    4,000 Antminer S19 XP procured for our own account.

  17. Jul2026

    Procurement mandate

    1,000 Antminer S21 XP for a Paraguayan energy company.

07 · People

Run by its own people, on the ground.

  • Portrait of Jhony Harraka

    Jhony Harraka

    Co-founder & Chief Executive Officer

  • Portrait of Andy Jasmin

    Andy Jasmin

    Co-founder & Chief Operating Officer

  • Portrait of Iván Kronawetter

    Iván Kronawetter

    VP — Operations

  • Portrait of Marlene Arguello

    Marlene Arguello

    VP — Human Resources

  • Portrait of Gualberto Martinez

    Gualberto Martinez

    Director of Mining Processes & Systematization

  • Portrait of Vanessa Barrios

    Vanessa Barrios

    VP — Treasury

  • Portrait of Daniel Pérez

    Daniel Pérez

    Head of Accounting

  • Portrait of Humberto Galeano

    Humberto Galeano

    Head of IT & Software Development

Cordillera de los Altos, Paraguay

08 · Community

Growing with Paraguay.

Formal jobs, skills and spending that stay in the country where the power is generated.

  • Local jobs

    33 employees

    Formal jobs: all staff registered with IPS social security.

  • Skills & training

    In-house teams

    Recruitment and training led by our own HR team, with in-house maintenance and IT teams.

  • Buying Paraguayan since

    2020

    Construction, metalwork and electrical engineering contracted from national industry.

  • Contributing locally

    5 municipalities

    Municipal taxes paid in the five municipalities where we operate.

09 · Investor access

Request investor materials.

For funds, family offices, strategic partners and lenders. We respond personally.